Monday, March 14, 2011

Japan Nuclear Power Plant

Timeline: Japan power plant crisis

There are fears about the safety of Japan's nuclear power stations. The authorities are working to prevent a second explosion at the Fukushima nuclear power station, where there was a huge blast on Saturday. An emergency has also been declared at the Onagawa nuclear plant, after high radiation levels were detected. BBC News looks at what has happened.

Explosion at Fukushima power station

Friday, 11 March: 1446 local time (0546 GMT)

The 8.9-magnitude earthquake strikes off the coast of Honshu island at a depth of about 24km. The tremor triggers the automatic shutdown of 11 of the nation's nuclear power reactors, including reactor units 1,2 and 3 at the Fukushima Daiichi power plant. Reactor units 4, 5 and 6 were undergoing routine inspections, so were not operating.

The quake causes the power station to be cut off from the national electricity grid. The plant's operators, Tokyo Electric Power Co (Tepco), find that the diesel-powered emergency generators for units 1 and 2 are not working and notify government officials.

1541: Tepco reports that the emergency generators for reactor units 1, 2 and 3 have failed - some reports suggest that the diesel-powered back-up systems are affected by the tsunami.

In the following hours, engineers attempt to install mobile power units to replace the diesel systems and manage to stabilise conditions at units 2 and 3, but not at unit 1.

1600: Japan's Nuclear and Industrial Safety Agency (Nisa) sets up an emergency headquarters to gather information on potential damage to the nation's 55 nuclear reactors.

1930: Chief Cabinet Secretary Yukio Edano announces that Prime Minister Naoto Kan has declared a "nuclear emergency status". Officials reassure people that this is standard procedure in events like this and no radioactive material has been detected in the area surrounding the power station.

Fukushima Daiichi power station

There are six reactors known as 'units' in the power station.

Unit 1

  • 439 MW Boiling Water Reactor (BWR); opened in 1971
  • Automatically shut down
  • Water level decreasing
  • Pressure release implemented
  • Seawater pumped in
  • Explosion observed with unknown effect

Unit 2

  • 760 MW BWR; opened in 1974
  • Automatically shut down
  • Water level lower but steady
  • Preparations for pressure release
  • Seawater reportedly pumped in

Unit 3

  • 760 MW BWR; opened in 1976
  • Automatically shut down
  • Cooling systems fail
  • Pressure release implemented
  • Seawater pumped in
  • Fears of an explosion

Unit 4

  • 760 MW BWR, opened in 1978
  • Shut for periodic inspection

Unit 5

  • 760 MW BWR; opened in 1978
  • Shut for periodic inspection

Unit 6

  • 1,067 MW BWR; opened in 1979
  • Shut for periodic inspection

2100: Residents within a 3km radius of the power station are told to leave their homes, while those within a 10km radius are told to stay at home in case it is necessary to extend the evacuation area.

Following the automatic shutdown of the reactors, and the failure of emergency generators, pressure in the unit builds up as a result of the pumps in the cooling system not working properly.

The pressure is the result of the reactor's residual "decay" heat causing the coolant, which is not being circulated, to evaporate.

The consequent increase in pressure in the coolant circuit can be controlled by pressure release valves, but this leads to an increase in pressure within the reactor building containment chamber.

Tepco says that the pressure inside reactor unit 1 is more than twice normal levels.

Saturday, 12 March: 0530 local time

In order to release some of the pressure inside the reactor unit, the decision is taken to vent some of the steam, which contains a small amount of radioactive material, into the air.

0819: An alarm alerts workers that the position of one control rod (used to halt the reactor) is unclear (whether it is fully inserted into the reactor or outside the reactor, allowing it to continue generating heat)

1009: Tepco confirms it has released a small amount of vapour into the atmosphere to reduce pressure in reactor unit 1.

1043: Control rod alarm stops, and all rods are confirmed as being fully inserted.

1058: In order to release some of pressure inside reactor unit 2, some steam was vented into the air. Again, this contains a small amount of radioactive material.

1530: TV cameras capture a massive explosion at the power station. The pictures appear to show that the outer structure of one of four buildings at the plant has collapsed. Tokyo Electric Power Co says four workers have been injured in the blast.

2000: Uncertainty surrounds what was the actual cause of the explosion, and what damaged was caused by the blast.

Chief Cabinet Secretary Yukio Edano confirms that the concrete building surrounding the steel reactor container has collapsed as a result of the blast, but the steel containment chamber itself had not been damaged.

2020: Tepco begins pumping seawater, mixed with the element boron, into unit 1's reactor. Boron is used as a shield in nuclear reactors, as it controls the nuclear reaction.

Nisa confirms that monitoring systems in the area have detected presence of radioactive elements caesium-137 and iodine-131 in the vicinity of unit 1. It reports an initial increase in levels of radioactivity around the plant, but says these levels have been observed to lessen.

2300: In its latest update, the plant's operator says: "We are preparing to implement a measure to reduce the pressure of [unit 3's] reactor containment vessels under the instruction of the national government."

Sunday, 13 March: 0122 local time

An official at Japan's nuclear agency rates the incident at 4 on the 0-7 international scale of severity. The 1986 Chernobyl disaster was rated 7, while the 1979 Three Mile Island accident was rated 5.

0320: The World Health Organisation says the risk to the public from the radiation leak at Fukushima is "probably quite low".

0523: The International Atomic Energy Agency says the plant's operator has confirmed that the containment vessel around unit 1 is intact and levels of radioactivity nearby have fallen in recent hours.

0623: An official from Nisa says the emergency cooling system at the plant's unit 3 reactor has failed.

0752: Tepco say it is preparing to release steam - containing a small amount of radioactive material - from unit 3 in an effort to lower the temperature inside. It is also looking for an alternative way to inject water into the reactor because without a continuous flow of water, there is a danger that the fuel rods will become exposed to the air and could melt.

0826: Yukio Edano tells state TV the unit 3 reactor was in danger, but attempts are under way to vent steam. Subsequently, it is reported that radiation has again risen above legal safety limits around the plant.

1326: Mr Edano says venting of unit 3 was completed at 0841 local time, but a partial meltdown in the reactor is still "highly possible".

1538: The Japanese government warns of the risk of another reactor explosion following the failure in unit 3. But a spokesman attempts to reassure people by saying the unit is designed to protect the reactor core in the same way as unit 1, and - so far - the radioactivity released into the environment does not pose a threat to human health.

2005: In his latest public briefing on the situation, Mr Edano says authorities have begun injecting seawater into the unit 3 reactor to try to lower the temperature - as they did on Saturday with unit 1.

He says the water level inside is thought to be rising to more satisfactory levels, but the gauge, which seems to be broken, is not showing this.

2209: It is reported that Tepco is planning to pump seawater into reactor number 2 at the plant - this is the first time problems have been reported with this third unit.

It is worth noting that using seawater like this is terminal for a nuclear reactor. It is a last-ditch move and renders the reactor permanently unusable.

2241: UN nuclear watchdog, the IAEA, says a state of emergency has been declared at a second Japanese nuclear power plant, Onagawa. The IAEA says high radiation levels had been found around the plant. A fire broke out in the turbine building of one the reactors at Onagawa on Friday, but was put out.

2350: Japan's nuclear safety agency says there is no problem with the cooling systems at the Onagawa plant. It blames the high radiation levels on radioactive releases from the Fukushima Daiichi complex.

Monday, 14 March: 0053 local time

Malcolm Crick, secretary of the UN Scientific Committee on the Effects of Atomic Radiation, tells Reuters: "This is not a serious public health issue at the moment. It won't be anything like Chernobyl. There the reactor was operating at full power when it exploded and it had no containment."

0207: A cooling pump at the Tokai nuclear power plant, 120 km (75 miles) from Tokyo, has failed, a plant spokesman says. But he says an additional pump is working and is cooling the reactor. Japan Atomic Power Company says the temperatures of the reactor have continued to fall.

0707 For full coverage of the crisis at Japan's nuclear power plants, as well as other developments in the wake of Friday's earthquake and tsunami, please go to our live page.

Boiling water nuclear reactor


--
http://bahartea.blogspot.com

Tuesday, February 22, 2011

Kalau Mau ke Bali

Hotel:
1. Sebaiknya pesen melalui travel (Panorama, Smailing, Vaya, Dwidaya, etc.) karena jauh lebih murah.
2. Atau coba disini untuk liat2 dulu: http://www.hotelmurahbali.com/
3. Kalau mau murah di daerah Sanur, tapi jauh kemana-mana.
4. Kalo mau yg ada pantainya, paling bagus daerah Nusa Dua, atau Benoa.
5. Kalo mau di tengah kota, coba di daerah jl. Kartika Plaza. Banyak banget hotel disitu.
6. Atau yg udah pasti nyaman dan aman, chain hotelnya Harris, Mercure, Santika, Tune hotels, etc. Hrg sekitar 400rban

Sekali lagi, jangan lupa semuanya beli di travel. Lebih Murah.

Charter mobil:
1. Avanza : 200rb/hari sampe puas.
2. Karimun : 150rb/hari sampe pegel.
3. Kijang (kayak bahar) : 150rb/hari sampe mogok... he..he..
ada juga yg cuma nyewain per 10jam.
Kalo ngasih harga lebih tinggi dari ini, tawar aja. 

Tips: gak usah belaga bicara bali. Orang bali justru gak suka. Kecuali emang fasih, baru deh kita dikasih harga murah.

Lunch:
1. Nasi Pedas (Jl. raya kuta, sebelah hotel ratna)
2. Ayam Plengkung (Jl. Raya Kuta)
3. Klapa (Dreamland)
4. Warung Bakudapa - Sopbuntut best in town (Seminyak)
5. Bebek Bengil (Ubud)
6. Bebek Tepian sawah (Jl Raya Goa Gajah, Ubud)
7. Nasi Ulam (Nusa Dua arah yg ke Benoa)
8. Nasi Jinggo - Bu Jumar (Deket Discovery)
9. Ayam Taliwang Bersaudara (Jl. Imam Bonjol)

Watching Sunset (dateng jam 16.00):
1. Rock Bar (Hotel Ayana, Jimbaran)
2. Potato Head (Seminyak)
3. Kudeta (Seminyak)
4. Karma Kandara (Daerah Jimbaran sebelum Dream Land)

Dinner:
1. Potato Head (Seminyak)
2. Massimo (Seminyak)
3. Warung Eropa (Seminyak)
4. Queen Tandoor - Indian & Chinese Food (Seminyak)
5. Warung Italia (Seminyak)
6. Iga Bakar Nuri (Ubud, atau di Kerobokan Kuta)
7. Steak Rumors (sblh Tratoria, Seminyak)
8. Gurita Seafood (Jl. Raya Kuta)
9. Jimbaran Seafood - Menega Cafe (Jimbaran)
10. Seminyak Square (Seminyak)

Buat berjemur & watersport di pantai:
1. Nusa Dua
2. Benoa
3. Padang-padang
4. Petitenget
5. Dreamland (bulan April keatas)

Spa:
1. Jari menari (Nusa Dua)
2. Cozy (Sunset Road)
3. Hotel Oasis (Nusa Dua), tukang pijetnya belajar di Dubai.
4. Hotel Ayana (2010 World's #1 spa), tapi siapin duit 5jtan.
5. Atau sepanjang jalan di Legian, murah meriah 70rban.

Shopping/oleh2:
1. Krishna (Kuta atau Denpasar)
2. Erlangga (Denpasar)
3. Pasar Ubud
4. Balicious roll - made to order (Jimbaran deket GWK)
5. Pia Legong (Jl. Bypass Kuta)
6. Daerah Seminyak, sepanjang jalan.

Source: Oji


Friday, January 28, 2011

Ketika Hidup Menjadi Lebih Hidup

Ketika Hidup Menjadi Lebih Hidup

Bismillah, mungkin judul di atas yang paling tepat untuk mengungkapkan apa yang terjadi di diri ini. Di saat segala sesuatu yang kujalani penuh dengan keterbatasan atau lebih tepatnya mendekati keputus-asaan, Alloh ternyata punya skenario untuk merubah keadaan ini menjadi jauh lebih baik untuk aku dan istriku. 
Anugrah ini Alloh berikan melalui jalan rejeki istriku. Dulu, butuh pertimbangan yang teramat sangat panjang untuk menentukan apakah istriku harus ikut ke kantor baru nya di Bintaro atau memutuskan berhenti dan mencoba menjadi PNS. Semua syarat untuk mengurus PNS sudah terpenuhi, sampai test pertama pun hampir dijalani. Tetapi, itulah Alloh yang paling tau cara membolak-balikkan hati siapapun. Test PNS hari itu ternyata berbarengan dengan jadwal pindahan kantor lama ke kantor baru istri di Sektor 9. Walhasil, test PNS hari pertama itu ditinggalkan dan memilih ikut pindahan ke kantor baru di Bintaro.
Singkat cerita, surat pengunduran diri istri sudah dibuat dan sudah diserahkan ke atasannya. Lagi-lagi Alloh secara tidak langsung menunjukan jalan untuk istriku. Atasannya ternyata menawarkan kembali untuk tetap bekerja sebagaimana mestinya. Dicoba 1-2 bulan dulu, kalau memang dirasa tidak cocok, silahkan kalau memang mau keluar, tidak apa-apa. Kurang lebih itulah jawaban atasannya. 
Saat istriku menyanggupi tawaran ini, pikiranku sederhana, harus segera mencari kontrakan di Bintaro untuk tempat tinggal kami berdua selama istri kerja di Bintaro nanti. Dan benar saja, ternyata istri betah untuk melanjutkan kerja di sana. 
Minggu lalu, istriku baru saja mendapatkan award sebagai salah satu bentuk penghargaan terhadap kinerja para karyawan. Atas dasar kejujurannya memegang amanah sebagai cashier, ternyata membuahkan hasil dengan terpilihnya istri menjadi salah satu karyawan yang mendapatkan penghargaan. 
Alloh ternyata belum selesai memberikan kejutan untuk istriku, di saat yang sama, penilaian kerja selama satu tahun ternyata membuahkan hasil pula terhadap pendapatannya. Di saat aku sebagai seorang suami yang tidak kunjung mengalami perubahan berarti dalam pekerjaan, di sisi lain Alloh memberikan rejeki dalam bentuk lain, yaitu dengan istriku. Di saat kami berdua menanti pengharapan dengan segera diberikannya keturunan (anak), Alloh mungkin membelokkan pengharapan kami ke bentuk lain yang tidak pernah bisa diduga sebelumnya.
Inilah yang mungkin aku sebut dengan kekuasaan Alloh. Di mata-Nya, tidak ada yang tidak mungkin untuk memberi jalan rejeki. Tidak dengan tanganku, tetapi dengan perantaraan istriku. Subhanalloh.
Semoga kami berdua selalu tetap menjadi Ahli Syukur atas Nikmat-Mu Ya Alloh. 


Bahar & Dana.


Monday, October 11, 2010

Hidup Nomaden

Hidup itu PILIHAN

Hidup ini memang aneh, rumah sudah punya tapi sekarang malah harus kos karena keadaan yang tidak memungkinkan untuk pulang hari dari dan ke rumah. Semuanya bermula dari kantor istri yang pindah dari Selatan Jakarta ke Bintaro sektor 9. Setelah dihitung-hitung, andaikan berangkat kerja naik mobil setiap hari, cukup lumayan ongkos yang harus dikeluarkan. Solusi pertama sudah gugur. Solusi kedua, berangkat dari rumah tetap naik mobil sampe kantor istri, dari kantor istri naik motor ke kantor di Senayan. Ternyata, biayanya masih cukup lumayan. Kos akhirnya jadi solusi ketiga dan yang akan dijalani.
Disuruh berhenti kerja, istri keberatan. Ya apa boleh buat, hidup itu pilihan. Mau ngga mau, suka ngga suka, saya pun akhirnya harus ikut kos demi menjaga dan menemani istri tercinta. Semoga saja istri betah dan kerasan kerja di Bintaro nanti. Andaikan suka, betah dan kerasan, mungkin beli rumah lagi di Bintaro menjadi solusi yang paling tepat. Biarlah rumah di depok hanya untuk pulang Sabtu dan Minggu.

Friday, July 16, 2010

Kegagalan dan Kegagalan.......

Tulisan ini sengaja dibuat untuk mengingat kegagalan adik-adikku yang sedang berjuang demi pendidikan.
Adikku yang paling kecil, dengan sangat PD dan mantap bilang, bahwa dia pasti dan harus diterima di SMP 2 Cikarang Utara. Tapi ternyata gagal, malah masuk ke SMP yang tidak diharapkan. Ujian pertama buatku.

Adikku Yayah, yang ingin kuliah dengan jurusan favorit orang tua, dengan jalur snmptn, ternyata juga gagal. Ujian kedua buatku.

Aku merasa seperti gagal mendidik adik-adikku. Aku akui,memang tidak ada kontrol dan pengawasan semenjak aku hidup dan bekerja di Jakarta.

Ampuni aku Ya Allah, Maafkan aku adik-adikku, aku tidak total mendidikmu, aku merasa gagal membimbingmu.

Aku berharap, Allah punya jalan lain, Allah punya maksud lain dengan jalan dan tujuan hidup adik-adikku ini.

Kalibaru, Menjelang Tengah Malam, 16 Juli 2010

Monday, May 31, 2010

Jadwal SPMB UNS (Update)


JALUR SPMB KEGIATAN JADWAL
PMDK
(Sarjana dan Diploma) 
Pendaftaran/Pembayaran  21 Desember 2009 - 29 Januari 2010 
  Penyerahan Dokumen  21 Desember 2009 - 29 Januari 2010 
  Ujian Khusus/Ketrampilan  13 Pebruari 2010 (Khusus PMDK Porseni) 
  Pengumuman  1 Maret 2010 
  Registrasi (Bagi yang lulus seleksi) 
  1. Registrasi I (On-Line): 8 - 19 Maret 2010
    (Pembayaran Biaya Pendidikan)
  2. Placement Test Bahasa Inggris : 28 Maret 2010
  3. Registrasi II (On-Desk): 16 - 17 Juni 2010
    (Pemeriksaan dokumen & tes kesehatan)
 
SNMPTN
(Seleksi Nasional Masuk Perguruan Tinggi Negeri) 
Pendaftaran/Pembayaran 
  1. 2-31 Mei 2010
    (Lulusan 2008,2009,2010 UN Utama)
  2. 10-12 Juni 2010
    (Lulusan 2010 UN Ulangan)
 
  Ujian Tulis  16-17 Juni 2010 
  Ujian Khusus/Ketrampilan  18-19 Juni 2010
(Untuk beberapa Prodi tertentu) 
  Pengumuman  17 Juli 2010 
  Registrasi (Bagi yang lulus seleksi) 
  1. Online : 20- 23 Juli 2010
    (Pembayaran SPP,BPI & Lain2 via Bank)
  2. Ondesk : 27 - 28 Juli 2010
    (Pemeriksaan dokumen & tes kesehatan)
  3. Placement Test Bahasa Inggris : Diumumkan Kemudian
 
SPMB Swadana  Pendaftaran/Pembayaran  7 Juni - 23 Juli 2010 
  Ujian Khusus/Ketrampilan  26 Juli 2010 
  Pengumuman  31 Juli 2010 
  Registrasi (Bagi yang lulus seleksi) 
  1. Online : 3 - 6 Agustus 2010
    (Pembayaran SPP,BPI & Lain2 via Bank)
  2. Ondesk : 10 Agustus 2010
    (Pemeriksaan dokumen & tes kesehatan)
  3. Placement Test Bahasa Inggris : Diumumkan Kemudian
 
SPMB TRANSFER S-1  Pendaftaran/Pembayaran  19 Agustus - 2 September 2010 
  Ujian Tulis  6 September 2010 
  Ujian Khusus/Ketrampilan  7 September 2010 
  Pengumuman  17 September 2010 
  Registrasi (Bagi yang lulus seleksi) 
  1. Online : 28-29 September 2010
    (Pembayaran SPP,BPI & Lain2 via Bank)
  2. Ondesk : 29-30 September 2010
    (Pemeriksaan dokumen)
  3. Placement Test Bahasa Inggris : Diumumkan Kemudian
 
DIPLOMA 3 & 4  Pendaftaran/Pembayaran  Gel 1: 8 - 24 Juni 2010
Gel 2: 20 Juli - 6 Agustus 2010 
  Ujian Tulis  Gel 1: 30 Juni 2010
Gel 2: 11 Agustus 2010 
  Ujian Khusus/Ketrampilan  Gel 1: 1 - 2 Juli 2010
Gel 2: 12 - 13 Agustus 2010 
  Pengumuman  Gel 1: 8 Juli 2010
Gel 2: 20 Agustus 2010 
  Registrasi (Bagi yang lulus seleksi)  Gel 1:
  1. Online : 13 - 15 Juli 2010
    (Pembayaran SPP,BPI & Lain2 via bank)
  2. Ondesk : 15 - 16 Juli 2010
    (Pemeriksaan dokumen & tes kesehatan)
  3. Placement Test Bahasa Inggris : Diumumkan Kemudian
Gel 2:
  1. Online : 23 - 25 Agustus 2010
    (Pembayaran SPP,BPI & Lain2 via bank)
  2. Ondesk : 24 dan 26 Agustus 2010
    (Pemeriksaan dokumen & tes kesehatan)
  3. Placement Test Bahasa Inggris : Diumumkan Kemudian
 
Pascasarjana  Pendaftaran/Pembayaran  Gel 1: 23 Nopember 09 - 16 Januari 2010
Gel 2: 25 Januari - 16 April 2010
Gel 3: 19 April - 14 Mei 2010
Gel 4: 24 Mei - 16 Juli 2010
Gel 5: 30 Agustus - 17 Nopember 2010 
  Ujian Tulis  Gel 1: 23 Januari 2010 (di PPs UNS)
Gel 2: 24 April 2010 (di PPs UNS)
Gel 3: 22 Mei 2010 (di PPs UNS)
Gel 4: 24 Juli 2010 (di PPs UNS)
Gel 5: 20 Nopember 2010 (di PPs UNS) 
  Ujian Khusus/Ketrampilan  Gel 1: Tergantung masing-masing Prodi
Gel 2: Tergantung masing-masing Prodi
Gel 3: Tergantung masing-masing Prodi
Gel 4: Tergantung masing-masing Prodi
Gel 5: Tergantung masing-masing Prodi 
  Pengumuman  Gel 1: 12 Pebruari 2010
Gel 2: 7 Mei 2010
Gel 3: 11 Juni 2010
Gel 4: 13 Agustus 2010
Gel 5: 6 Desember 2010 
  Registrasi (Bagi yang lulus seleksi)  Gel 1: 22-26 Pebruari 2010
Gel 2: 23-27 Agustus 2010
Gel 3: 23-27 Agustus 2010
Gel 4: 23-27 Agustus 2010
Gel 5: 20-25 Pebruari 2011 
Revisi Terakhir: 04 Maret 2010 10:18 WIB
--
http://bahartea.blogspot.com

Friday, May 21, 2010

Passing Grade Unila 2009


Passing Grade Universitas Lampung

Berikut adalah Passing Grade Unila Jurusan IPA
1. Pendidikan Dokter : 42.83 %
2. Pend. Matematika : 24.67 %
3. Teknik Elektro : 24.17 %
4. Teknik Kimia : 24.17 %
5. Pend. Kimia : 24.00 %
6. Ilmu Komputer : 24.00 %
7. Teknik Sipil : 23.83 %
8. Agribisnis : 23.50 %
9. Kimia : 23.50 %
10. Pend. Biologi : 23.33 %
11. Teknologi Hasil Pertanian : 22.83 %
12. Manajemen Hutan : 22.83 %
13. Matematika : 22.67 %
14. Pend. Fisika : 22.67 %
15. Teknik Mesin : 22.50 %
16. Biologi : 21.83 %
17. Teknik Pertanian : 21.83 %
18. Produksi Ternak : 21.67 %
19. Agroteknologi : 21.50 %
20. Budidaya Perairan : 21.17 %
21. Fisika : 20.00 %
22. Geofisika : 19.83 %

About Me

Satu di antara makhluk-Nya yang ingin menjalani hidup dengan "kemandirian"